Erdoğanlar has always been a leader with its experiences in heavy transportations in Turkey in 35 years. It has transported your 80 towers and 90 low-bed fleet as well as your out of gauge tools like Construction equipments, yacht, factory equipments, tendon, heavy transport, reactor, generator, transformer, power distribution units, heavy transportation, oil exploration systems, wind energy facilities, etc. with experience gained by years.Heavy Transport, Heavy Transportation

2011, January
35 meters long 8 Tower Cranes loaded in Gebze was delivered to building site in Tehran in Iran.

Eastern Africa Ports
Erdoğanlar, is keeping on its FCL / Roro / Charter / Full / Partial Cargo regular service from Turkish ports to Eastern Africa Ports with success in the year 2011, too.

2011, January
We had transportation of 300 tons (Crushing/Sieving/ Washing Facilities) from Istanbul to Tanzania Dar Es Salaam port completed.

2011, January
4,50 diameter 2 Stream boilers loaded from Tekirdağ were transported to Kazakhstan, Pavlodar and placed to the installation place in discharge area.

2011, February
2 Power Transformers loaded from Balıkesir were delivered to the building site in Turkmenistan, Ashkhabad.

2011, March
90 and 75 tons heavy construction equipments’ transportation from Derince port to Dar Es Salaam, Tanzania and Mumbai, Kenya ports that we organized in January was completed.

2011, March
60 tons machine we loaded from Italy, Verona was delivered to receiver in Baku.

2011, April
4,40 and 4,20 diameter 8 Gas Turbines loaded from Ankara were transported to Kazakhstan, Atyrau building site.

2011, February
70 tons of 2 Press Machine loaded from Germany 44th Region were delivered to the customer in Iran, Tehran.